Making Western Balkans’ power systems CO₂ free by 2045 is possible and would save money.
Producing electricity from renewable energy sources and green hydrogen will cost 15 percent less up to 2045 than relying on lignite or gas. A full decarbonisation of the region’s power system will require a total investment of 43 billion euros over 30 years, 12 billion euros more than the fossil baseline. Even if investments are higher, renewables deployment can largely be financed from market revenues.
-
A decarbonised power system ensures security of supply.
A reliable yet carbon-free power system can be achieved with a combination of renewables, storage (hydro, batteries, thermal storage) and 5 GW of green hydrogen fuelled power plants. Deeper regional integration can further reinforce security of supply.
-
Fossil gas is not a bridge fuel.
The need for more ambitious climate action together with high and volatile fossil gas prices and ever cheaper renewables undermine the business case for new fossil gas infrastructure: any new fossil gas plant risks becoming a “stranded asset”. If the Western Balkan countries invest in hydrogen-ready infrastructure and storage technologies instead, they can reduce cumulative fossil gas demand by 50 percent up to 2045 while cutting overall costs by 12 percent compared to a strategy that bets on fossil gas to replace aging lignite.
-
Storage technologies provide flexibility and enable renewables expansion throughout the region.
Greater energy storage capacity enables rapid growth in PV, the most easily scalable renewables technology. Storage also lowers the need for hydrogen power plants that will replace gas plants. It is important not to overestimate hydrogen needs when planning for corresponding infrastructure. 5 GW of green hydrogen plants, covering 7 percent of demand in 2045, are needed for power system security of supply.
-